Projects of 2M
A genuine commitment to client satisfaction drives us to meet project deadlines. Completing projects on time is initially approached by establishing a schedule based on when deliverables need to be made and permits need to be in place. From that schedule, we assign intermediate milestones for the completion of major tasks and review periods. Project management software is used to monitor schedules and critical paths for each project.

SOME OF THE MAJOR 2M PROJECTS (ONGOING OR COMPLETED) ALONG WITH THE SERVICES PROVIDED
Client | Project |
COD-TWMD | Baker Pump Station Physical Modeling |
COD-TWMD | Pavaho & Baker Pump Station O&M |
COD-TWMD | Flood Control Electrical Improvements – Backup Generator Design* |
City of Frisco | Detention Pond Modifications Feasibility Study* |
Dallas Water Utilities | CWWTP Primary Clarifier Replacement Design – Sludge Handling System Design |
City of Bedford | Pressure Plane Improvements Electrical Design |
City of Fort Worth | VCWRF Arc Flash Analysis |
TXDOT | FM 916 – Drainage Study |
Dallas Water Utilities | Pipelines Replacement Design – 2013 (65,000 LF) |
COD-TWMD | On-Call Professional Engineering Services – Misc. Electrical and I&C Improvements Design |
Dallas Water Utilities | Pipelines Replacement Design – 2014 (2700 LF) |
Dallas Water Utilities | SWWTP Grit Improvements Project – Hydraulic Analysis |
City of Dallas / TXDOT | Skillman @ LBJ Interchange – Drainage Design/SW3P |
COD-TWMD | Animal Shelter – Drainage Design |
Dallas Water Utilities | ASIPS Improvements – Civil Site Design |
Dallas Water Utilities | CWWTP – SCADA Replacement |
COD-TWMD | East & West Levee Drainage Mapping |
Dallas Water Utilities | SWWTP Mechanical Maintenance – Clarifier Drives and Sludge Levelers Design |
City of Dallas | Energy Management System* |
City of Dallas | Sidewalk and Driveway Design* |
City of Dallas | Canada Drive – Pipeline Replacement Design |
Dallas Water Utilities | Pipelines Replacement Design – 2016 Contracts |
Trinity River Authority | Arc Flash Analysis |
City of Fort Worth | Pipeline Rehabilitation Design – Part 1* |
Dallas Water Utilities | CWWTP Mechanical Maintenance – Civil Site and Security System Design |
City of Dallas | Trinity Skyline Trail – H&H Modeling |
TXDOT | SH 359 – Drainage Design |
TXDOT | US181 – Drainage Design |
TXDOT | Amarillo Off System Bridge – Drainage Design |
TXDOT | I-35E Waxahachie – Drainage Design and SW3P |
TXDOT | I-30 – Pavement Markings |
City of Dallas | Mill Creek Tunnel – Scheduling and Document Control |
City of Dallas | Dolphin Street – Pipeline Replacement and Pavement Markings |
Dallas Water Utilities | SWWTP – Misc. Drainage Improvements – Pump Station Design |
DFW Airport | Southwest End Around Taxiway – 35% Design Validation |
DFW Airport | Southwest Consolidated Campus – Electrical / Drainage Design – Phase 1A |
DFW Airport | Southwest Consolidated Campus – Electrical / Drainage Design – Phase 1B |
DFW Airport | Drainage Master Plan – GIS and H&H Modeling |
DFW Airport | Southwest End Around Taxiway – Drainage Design and H&H Modeling including 2D Modeling – 70% Design |
DFW Airport | 18R Reconstruction – H&H Modeling and Drainage Design |
City of Dallas | Shaw Street and Morocco Avenue – Pipeline Replacement Design |
City of Dallas | Webb Chappal Road – Drainage and Pipeline Replacement Design |
Dallas Water Utilities | Pipelines Replacement Design – 2018 Contracts |
TXDOT | Bridge On/Off Replacement – Pharr District – Drainage Design |
DFW Airport | SADF Treatment and Recovery Program – Master Plan – Operational Study and GIS |
City of Fort Worth | Pipeline Rehabilitation – Part 2* |
Dallas County | FM 1382 Trail – SW3P, Traffic Control and Pavement Markings |
DFW Airport | 17R Rehabilitation – H&H Modeling and Drainage Design |
DFW Airport | Airfield Drainage Assessment Study – GIS and H&H Modeling |
Raleigh–Durham International Airport | Drainage Master Plan – GIS and H&H Modeling |
City of Fort Worth | Pipeline Rehabilitation – Contract 116* |
DFW Airport | Parking Lot SE –H&H Modeling & Drainage Design |
DFW Airport | Southwest End Around Taxiway – H&H Modeling and Drainage Design – Phase 1A |
DFW Airport | Southwest End Around Taxiway – H&H Modeling and Drainage Design – Phase 1B |
DFW Airport | Southwest End Around Taxiway – H&H Modeling and Drainage Design – Phase 2 |
TXDOT | AMA – Bridge On/Off – Pavement Markings/Signing and SW3P |
TXDOT | I-30 (I-635 to PGBT) – Pavement Markings |
TXDOT | BWD – Bridge On/Off – Pavement Markings/Signing and SW3P |
TXDOT | SH 36 Jones Creek to Brazos River- Project Scheduling & Reporting |
Dallas Water Utilities | Pipelines Replacement Design – 2020 Contracts |
Dallas Water Utilities | Pipelines Replacement Design – 2024 Contracts* |
TXDOT | US 380/US 75 Interchange – Pavement Markings |
DFW Airport | Outfall Grading Assessment –H&H Modeling & Drainage Assessment |
DFW Airport | Outfall 45 Engineering Evaluation –H&H Modeling & Drainage Assessment |
NTMWD | Bois d’Arc Lake Program Phase 2 – Document Control |
*Prime contracts |